by Basant Pratap Singh in The Kathmandu Post, Nov 5, 2023When Bhojraj Pathak reached Triveni Patan in the last week of August to attend the Badimalika fair his heart sank. He saw the stream that flows through the grassland area at an altitude of 3,840 metres above sea level had been dammed. A concrete and cement building was under construction near the stream. A concrete helipad was also being constructed in the lush grassland. Construction…