by Prithvi Man Shrestha in The Kathmandu Post, Dec 29, 2022The Nepal Electricity Authority (NEA) has shelved its plan to set up a substation at Trishuli Bazaar for the Nepal-China Cross-border Transmission Line as it plans to connect the power line with a Ratmate-based substation to be built with the assistance of the Millennium Challenge Corporation (MCC), a US aid agency. When the controversy over the MCC assistance was at its height before its eventual…